Ensure the substrate is structurally sound, stable, even and free from dust, grease, bitumen and loose coatings. Level imperfections and prime with BP cement primer as specified for the substrate. Fresh cement/lime-cement plaster should cure for 3–4 weeks and gypsum plaster for at least 2 weeks.
Process Heading
Prepare & Prime Surface